PROJECT UPDATE – Legana Childcare Centre
Topcut Group is proud to be working alongside Beardwood on the new childcare centre build at Legana – a standout project with some impressive design features already coming to life.
All steel works for this job have been manufactured and installed in-house by the Topcut team, using our 2.5T crawler crane and 14T Franna to get the job done safely and efficiently on site.
From the rolled steel sections to the large pre-fabricated roof assemblies, everything is bolting together perfectly to form what will be a striking and functional building for the local community.
And how good do those rammed earth walls look!
Great to be involved in this one – stay tuned for more progress updates!